Detailed Design for Donghai Port Phase 3 Coal Dock Construction Project (2018)

1. Project
 Detailed Design for Donghai Port Phase 3 Coal Dock Construction Project (2018)
2. Period
2018.03 ~2019.12
3. Tasks
  • Technical Services for berthing facility (Slit caisson type) construction - 330m length
  • Land side crane foundation design
  • Coal transfer equipment foundation design