Basic and Detailed Design of Electric Power Conduit Tunnel of Bukpyeong Thermal Power 345kv Underground Transmission Line
1. Project |
Basic and Detailed Design of Electric Power Conduit Tunnel of Bukpyeong Thermal Power 345kv Underground Transmission Line |
2. Period |
2011.11 ~2015.03 |
3. Tasks |
|
4. Client |
KEPCO E&C |