Basic and Detailed Design of Electric Power Conduit Tunnel of Bukpyeong Thermal Power 345kv Underground Transmission Line
| 1. Project |
| Basic and Detailed Design of Electric Power Conduit Tunnel of Bukpyeong Thermal Power 345kv Underground Transmission Line |
| 2. Period |
| 2011.11 ~2015.03 |
| 3. Tasks |
|
| 4. Client |
| KEPCO E&C |